BASELINE PROJECT · SAMPLE

Territorial report — Cajamarca mining concession AOI

Illustrative document for the Baseline project SKU (USD 22,000). Real delivery in 21 days with cited sources and 90-day Intelligence Mesh scenario.

1. Executive summary

DAI fused Sentinel-2 imagery (10 m), SRTM DEM, and GDACS/SENAMHI alerts over a 412 km² AOI in the Cajamarca mining basin. Three change clusters were detected on NE-facing slopes, −12% NDVI variation in an adjacent agricultural corridor, and moderate hydrological stress in access ravines.

2. Methodology & sources

DAI-ATLAS pipeline: orbital baseline → atmospheric normalization → change detection → territorial risk scoring. Verifiable sources:

  • Copernicus Sentinel-2 L2A — 2024–2026 passes
  • NASA SRTM 30 m + slope/aspect derivatives
  • SENAMHI — accumulated precipitation & anomalies
  • GDACS — regional hydrometeorological events
  • MTC / concessions (reference AOI layer)

3. Priority findings

Institutional classification for investment committee or due diligence:

  • NE slope geotechnical risk: MEDIUM — biweekly monitoring recommended
  • Tailings dam (south sector): LOW over 90 d window — no expansion >2 ha detected
  • La Shacsha ravine logistics corridor: HIGH hydrological stress in rainy season
  • Recommendation: Desk Perú for continuous monitoring + VTOL sortie in Phase 2

4. Intelligence Mesh scenario (90 days)

Agentic simulation on the AOI: baseline scenario of operational continuity with 2 extreme precipitation events raising logistics corridor disruption probability to 34%. Mesh recommends automatic alerts + confirmation VTOL sortie in week 6.